Monday, January 17, 2011

January progress--P.S. 1 year anniversary!


Above picture of the light switch installed to control the attic lights to be installed.

Ceiling light in office above; new wall sconce in office below.

Office light switches below that were installed by dad.

The stripping of another window in the guest bedroom.

Progress of the attic floor being built with insulation.





No comments:

Post a Comment